News



13 September 2013
The sea part of the official trials of the tugboat “RB-399” building No 937, pr. 90600 is successfully completed

Before the end of this year the tugboat will be put into operation within RF Northern Fleet.

The tugboat is intended for towing and berthing operations in harbor, roadsteads and coastal areas which comply with R3 navigation area, refloating of ships and vessels, fire fighting operations at floating and shore objects, oil and petroleum content products, cargo transportation, ice breaking and erosion operations.


read more
12 September 2013
The shipyard run of the tugboat “MB-93”, building No 504, the second from the series of 6 tugboats of project PE-65, built for the Russian Navy is completed

In November the tugboat will be put into operation within RF Pacific Fleet.

Assignment:

  • towing of vessels and floating objects in harbor areas and open seas
  • performing of escort operations at the speed of 10 knots
  • fire fighting operations at floating and shore objects;
  • oil and petroleum content products spill removal;
  • rescue and salvage operations;
  • ice–breaking of up to 0.8 m ice at the speed of up to 5 knots.

  • read more
    8 September 2013
    The State Commission has signed the Acceptance Acts for the tugboat “MB-92” (building No 503, pr. PE-65)

    The preparation are being made to its transportation to the port of basing – the Pacific Fleet of RF.

    Assignment:

  • towing of vessels and floating objects in harbor areas and open seas
  • performing of escort operations at the speed of 10 knots
  • fire fighting operations at floating and shore objects;
  • oil and petroleum content products spill removal;
  • rescue and salvage operations;
  • ice–breaking of up to 0.8 m ice at the speed of up to 5 knots.

  • read more
    7 September 2013
    Chief of Russian Navy admiral Viktor Chirkov visited Open JSC “Pella”

    As during the last year's visit, the Chief expressed his satisfaction with the implementation of state contracts, and noted the significant dynamics of the production capacity of the shipyard.

    During the visit the boat of pr. 03160 “Raptor” was demonstrated to V.V. Chirkov that was designed and built by the shipyard on behalf of the Russian Navy in the shortest possible time.

    According to the Chief of Russian Navy and Navy experts the boat by its tactical and technical characteristics comparable to the similar foreign military equipment and also have precedence in some aspects.


    read more
    7 September 2013
    The shipyard run of the head boat of pr. PI 22, built under the order of Federal State unitary enterprise “ROSMORPORT”

    The tests have confirmed the high seaworthiness and running performance of the boat.

    Assignment:

  • marine pilots’ transportation to and from the vessels under pilotage;
  • pilotage at shipping routes;
  • transportation of special staff, passengers and cargoes;
  • patrol and rescue operations;
  • service and pleasure trips.

  • read more
         |  12  |  13  |  14  |  15  |  16  |  17  |  18  |  19  |  20  |  21